SKILLED PERSONNEL

PROVEN PERFORMANCE

SATISFIED CLIENTS

SAFE WORKING ENVIRONMENT

INNOVATIVE ENGINEERING

COST EFFECTIVE FOUNDATION SOLUTIONS

 
   
 

345 Thames Street
Slurry Trench Cutoff Wall

Click images to enlarge
345
Trench Excavation

Location: Bristol, RI
Owner: Stone Harbour Development
Completion Date: February, 2004
General Contractor: Stonestreet Associates
Vital Statistics:
Project Value: $400,000
Wall Type: 36” Soil Bentonite
Wall Area: 24,000 S.F.
Wall Depth: 30’

Project Description:
A new residential condominium on Bristol, Rhode Island’s waterfront was constructed on an old industrial site which contained contaminated soils. East Coast Slurry Company was chosen to install a slurry trench barrier wall to prevent ground contaminants from migrating into the surrounding water table and ultimately into Bristol Harbor.

345
Backfill Mixing Plant

Completed Trench

Return to Project Gallery Page

 

 

145 Island Street, Stoughton, MA 02072, 781-344-5700

Geology of BostonSafety Welcome Methods Project Gallery FAQs Contact Us President's Message History