SKILLED PERSONNEL

PROVEN PERFORMANCE

SATISFIED CLIENTS

SAFE WORKING ENVIRONMENT

INNOVATIVE ENGINEERING

COST EFFECTIVE FOUNDATION SOLUTIONS

 
   
 

Harvard University Northwest Labs
Slurry Wall and LBE Construction

Click images to enlarge
harvard

Placement of Soldier Piles Laced in Pairs

Location: Cambridge, MA
Owner: Harvard University
Completion Date: December, 2005
General Contractor: Bond Brothers
Vital Statistics:
Project Value: $15,000,000
Wall Type: 36” SPTC and Reinforced Concrete Wall
3’ X 10’ Load Bearing Elements (total of 101)
Wall Area: 190,000 S.F.
Wall Depth: 83’

Project Description:
This project is one of the largest privately owned slurry wall foundation projects to have been constructed in New England in several years and was done in joint venture with TREVIICOS Corporation. This facility will contain 4 underground levels of laboratory space. Excavation through dense glacial till deposits with cobbles and boulders was completed with specialty clamshell buckets weighing approximately 14 tons each.


harvard

harvard
Clamshell Bucket Top of SPTC Wall

Return to Project Gallery Page

 

145 Island Street, Stoughton, MA 02072, 781-344-5700

Welcome Methods Project Gallery FAQs Tech Support Contact Us President's Message About Us