Harvard Biological Research Institute
Slurry Wall Foundation

Click images to enlarge
harvard
Tremie Concrete Placement

Location: Cambridge, MA
Owner: Harvard University
Completion Date: January, 2004
General Contractor: SKANSKA USA
Vital Statistics:
Project Value: $4,500,000
Wall Type: 30” SPTC Slurry Wall and Load Bearing Elements
Wall Area: 50,000 S.F.
Wall Depth: 52’


Project Description:
When completed, this facility, built entirely underground, will provide much needed research space at Harvard University. A campus quadrangle with a volleyball court will occupy the ground surface. Slurry wall and LBE construction allowed this work to take place with vital college facilities in operation on all four sides of the site, including an Egyptian antiquities museum, which imposed very strict movement and vibration criteria during construction. East Coast Slurry Company was able to complete the job without causing any problem for the surrounding facilities.

harvard harvard
Slurry Wall Excavation in Progress Exposed Wall and LBE Columns