Millenium Place
Drilled Shaft Foundations

Click images to enlarge
Millenium Place

Hydraulic Rotary Drill Rigs in Action

Location: Boston, MA
Owner: Millenium Partners
Completion Date: January, 2012
General Contractor: Suffolk Construction

Company Vital Statistics:
Project Value: $727,000.00
Drilled Shaft Diameter: 3.5’ Shaft Depth: 104’

Project Description:
East Coast Slurry Company installed twelve drilled shaft foundations for a 15 story residential building in Boston’s Downtown Crossing area. The shafts were socketed ten feet into argillite bedrock and were located within a few feet of the MBTA’s Orange Line subway. Obstructions from the original Orange Line earth support system were encountered during drilling, but were successfully penetrated. Drilling into the bedrock was performed with a combination of bullet auger and core barrel.


Millenium Place

Millenium Place