Two Financial Center
SPTC Slurry Wall

Click images to enlarge
image image
Concrete Pour with Five Tremie Pipes

Location: Boston, MA
Owner: Lincoln Property
Completion Date: December, 2007 
General Contractor: Suffolk Construction Company
Vital Statistics:            
Project Value: $3,800,000.00
Wall Type: 36” SPTC Slurry Wall
Wall Area: 28,300 S.F.
Wall Depth: 60’

Project Description:     
A very tight site with existing buildings inches away from the new foundation made an internally braced “soldier pile tremie concrete” slurry wall the foundation of choice for this project. The internal bracing for this 4 level basement had to be installed on an incline to avoid conflict with the continuously sloping cast in place floor slabs.This project was completed as a package with A.A. Will Corporation, providing a “seamless” scope of work for the general contractor and owner.  

image image image
Soldier Pile Preparation Installed Soldier Piles Braced Slurry Wall