PROVEN PERFORMANCE

SATISFIED CLIENTS

SAFE WORKING ENVIRONMENT

INNOVATIVE ENGINEERING

COST EFFECTIVE FOUNDATION SOLUTIONS

SKILLED PERSONNEL

 
   
 

What is up up construction?

Up up construction also offers some construction scheduling advantages over a traditional construction building sequence.  Typically, a perimeter slurry wall is constructed and is followed by mass excavation to the bottom of excavation (subgrade).  Foundation elements, most often cast-in-place footings, are installed at subgrade, followed by placement of structural columns extending back up to grade. At this point, basement work can proceed from the bottom up, and superstructure work can start from the ground up, hence the term up-up.

Back to FAQs page

 

 

 

145 Island Street, Stoughton, MA 02072, 781-344-5700

Geology of BostonSafety Welcome Methods Project Gallery FAQs Contact Us President's Message History