WELCOME

SAFE WORKING ENVIRONMENT

INNOVATIVE ENGINEERING

COST EFFECTIVE FOUNDATION SOLUTIONS

SKILLED PERSONNEL

PROVEN PERFORMANCE

SATISFIED CLIENTS

Simmons College

Location: Boston, MA
Owner: Simmons College
Completion Date: November, 2006
General Contractor: Payton Construction Company
Vital Statistics: Project Value: $9,500,000.00
Wall Type: 36" Reinforced Concrete Wall
Wall Area: 120,000 S.F.
Max. Excavated Depth: 170'

Project Description:
The new Simmons College School of Management building occupies a good portion of an existing at grade parking lot. A five level underground parking garage was planned to compensate for the lost parking space and to accommodate the additional space needed because of the new building. East Coast Slurry Company was contracted to install the perimeter slurry wall and 26 LBEs as part of a top down construction sequence. The LBEs penetrated up to 25’ of bedrock, requiring a hydromill to excavate the rock.