101 Cambridge Park
Location: Cambridge, MA
Owner: King Street Properties
Completion Date: April, 2021
General Contractor: Consigli Construction Company
Vital Statistics:
Project Value: $5,600,000.00
Wall Type: 36" Reinforced Concrete Wall and Slurry Struts
Wall Area: 47,000 S.F.
Max. Excavated Depth: 50'
Project
Description:
A new life science building was constructed adjacent to Cambridge's Alewife Train Station, in close proximity to three other new research buildings. Plans called for a three level basement to be constructed in "weight of rod" clay with very low shear strengths. A perimeter slurry wall with unreinforced concrete slurry struts below subgrade, acting as an additional level of temporary bracing, was built to meet strict project lateral movement and settlement criteria.