74 Middlesex Avenue

Location: Somerville, MA
Owner: Greystar
Completion Date: April, 2022
General Contractor: Turner Construction Company
Vital Statistics: Project Value: $8,300,000.00
Wall Type: 36" Reinforced Concrete Wall with slurry subgrade struts
Wall Area: 67,000 S.F.
Max. Excavated Depth: 63'

Project Description:
74 Middlesex is positioned at the edge of the new Assembly Square community near Assembly Station on the MBTA's Orange Line. This life science office and lab building included a 312 level basement with an excavated depth of 48' below subgrade. Numerous utilities and existing structures were present around the site, including a 36" MWRA water line, a 9' x 12' storm drain, and an Interstate 93 exit ramp. Allowable lateral movements around the site were restricted to 12". High voltage overhead lines were also within close proxiMid74y to the proposed foundation. East Coast Slurry worked with the design team to design a 36" slurry wall with 2 levels of internal bracing plus a level of subgrade slurry struts to meet these stringent design requirements.